Dr Mswelo Residence, 5kW Off Grid System_ Mochudi, Botswana
The project involved the design, re-installation, and commissioning of a 5kW Victron Off-Grid System, including a 5kW Victron Easy Solar Inverter, 12 solar panels (475W each), and a 9.6kWHr Hubble Li-Ion Battery Bank. The execution dates were from 1 July 2023 to 4 July 2023. V.E. Solutions was the main contractor.
Client details: Dr Mswelo | +267 74 205 626
Sua Pan Airport 10kW Off Grid System, Sowa Town
The project involved the design, installation, and commissioning of a 10kW Victron Off-Grid System, complete with a 10kW Inverter, 2 MPPT Charge Controllers, 20 solar panels (465W each), and a 30kWHr Freedom Li-Ion Battery. This undertaking took place from December 5, 2021, to March 31, 2022, with CLS Systems as the main contractor.
Client: Botash Pty Ltd Contact Details: Mr. M. Kuwali, Managing Director, +25671397194
Skelemani Farm 2kW Off Grid System, Kodibileng
The project involved the design, re-installation, and commissioning of a 2kW Mecer Off-Grid Scheme, including a 2kW Mecer Inverter, 4 solar panels (380W each), and a 7.56kWHr Lead Acid Battery Bank. This project was executed on June 11, 2022, with V.E. Solutions as the main contractor.
The project encompassed several components, including the design, installation, and commissioning of a 12kW Deye Grid-Tied System with a 12kW 3-phase Deye Hybrid Inverter, 24 solar panels (545W each), and a 10.1kWHr Alpha Ess Li-Ion Battery. Additionally, a 2kW Geyser Control System (Solar AC automatic transfer system) was installed. Load analysis, load balancing, and re-wiring and configuration of the entire electrical system for a double-storey structure were performed. This project took place from October 5, 2022, to October 11, 2022, with CLS Systems as the main contractor and Mr. O. Seokamo as the client.
Client Details: Mr. M. Kuwali | Managing Director |+25671397194
Motswaledi Farm 3kW Off Grid System & Electrical installation, Serowe
The project included the design, installation, and commissioning of a 3kW Growatt Off-Grid Scheme, consisting of a 3kW Growatt Inverter, 3 solar panels (475W each), and a 2.8kWHr Pylontech Li-Ion Battery Bank. Additionally, electrical installation work was performed for a Bachelor Pad. The project was executed from July 7, 2022, to July 8, 2022, with V.E. Solutions as the main contractor.
Client Details: Mr. Motswaledi, +267 73 065 920
Barungwi Farm 3kW Off Grid System, Mathethe
The project encompassed the design, installation, and commissioning of a 3kW Kodak Off-Grid Scheme, featuring a 3kW Kodak Inverter, 7 solar panels (410W each), and a 7.56kWHr Lead Acid Battery Bank. This project was executed on September 20, 2022, with V. E. Solutions serving as the main contractor.
The project involved the design, installation, and commissioning of a 10kW Jinko Grid Tied Scheme with Backup at Apex Properties, Plot No 14442 in Gaborone, Botswana. This system included a 10kW Jinko Hybrid Inverter and 16 solar panels (555W each). The project spanned from June 3, 2023, to June 28, 2023, and was carried out by Apex Properties, with Eng. Raj serving as the main contact.
The project involved the design, installation, and commissioning of a 20kW Jinko Grid Tied Scheme with Backup for Meaty Delights in Gaborone, Botswana. This comprehensive system featured 2 x 10kW Jinko Hybrid Inverters, 42 solar panels (555W each), and a 4.8kWHr Hubble Li-Ion Battery Bank. The project was carried out from June 3, 2023, to June 28, 2023, with Eng. Raj as the main contact, and Apex Properties as the client.
The project entailed the design, installation, and commissioning of a 10kW Jinko Grid Tied Scheme with Backup for Mr. Duan's residence in Gaborone, Botswana. This system included 2 x 5kW Jinko Hybrid Inverters, 20 solar panels (475W each), and a 10.24kWHr Jinko Li-Ion Battery Bank. The project was executed from June 3, 2023, to June 28, 2023, with Eng. Raj as the main contact, and Apex Properties as the client.
Client Details:
Client: Apex Properties
Contact: Eng. Raj at +267 74 213 569
Apex Properties 30kW Hybrid System, Gaborone
The project encompassed the design, installation, and commissioning of a 30kW Jinko Grid Tied Scheme with Backup for Apex Properties in Gaborone. This extensive system featured 3 x 10kW Jinko Hybrid Inverters, 58 solar panels (300W each), and a 9.6kWHr Jinko Li-Ion Battery Bank. The project was executed from April 24, 2023, to May 1, 2023, with Eng. Raj serving as the main contact and Apex Properties as the client.
Client Details:
Client: Apex Properties
Contact: Eng. Raj at +267 74 213 569
Apex Properties 30kW Hybrid System, Gaborone
The project encompassed the design, installation, and commissioning of a 30kW Jinko Grid Tied Scheme with Backup for Apex Properties in Gaborone. This extensive system featured 3 x 10kW Jinko Hybrid Inverters, 58 solar panels (300W each), and a 9.6kWHr Jinko Li-Ion Battery Bank. The project was executed from April 24, 2023, to May 1, 2023, with Eng. Raj serving as the main contact and Apex Properties as the client.
Client Details:
Client: Apex Properties
Contact: Eng. Raj at +267 74 213 569
Apex Head Office 21.6kW Grid Tied Scheme, Gaborone
The project involved the design, installation, and commissioning of a 21.6kW Grid Tied Scheme at Apex Head Office in Gaborone. This project included 3 x 7.2kW Kodak Inverters, 56 solar panels (360W each), and a 30kWHr Hubble Battery Bank. The project was carried out from November 1, 2022, to December 14, 2022, with Mr. Suprajit, Procurement Manager, as the main contact and Apex Properties as the client.
Client Details:
Client: Apex Properties
Contact: Mr. Suprajit at +26774175566
Ms. Boitumelo Residence 3kW Off Grid System, Mathethe
The project involved the design, installation, and commissioning of a 3kW Off-Grid Scheme for Ms. Boitumelo's residence in Mathethe. This system featured a 3kW Kodak Inverter, 6 solar panels (470W each), and a 2.8kWHr Pylontech Li-Ion Battery Bank. The project was executed from December 22, 2021, to December 23, 2021, with Apex Solar as the main contractor, and Mr. Peter as the main contact.